Setup Equipment Types & Groups
Manage Individual Equipment Types
Defined Equipment Types:
Define Equipment Groups
Defined Groups:
Assign Equipment to Group:
Equipment in This Group (Total Wattage: 0W):
Equipment | Qty | Wattage Each | Total Wattage | Action |
---|
Define Operational Day & Group Usage
Define Daily Time Slots
Defined Time Slots (Must cover 24h without gaps/overlaps):
Set Group Usage per Time Slot
For each equipment group, specify the percentage (%) of its full power it typically draws during each defined time slot. (e.g., 100% if fully active, 10% for standby, 0% if off).
Energy Flow Analysis & Report
Overall Estimated Totals for a Typical Day
Total Daily Energy: 0 kWh | Est. Daily Cost: $0.00
Est. Monthly Energy: 0 kWh | Est. Monthly Cost: $0.00
Est. Annual Energy: 0 kWh | Est. Annual Cost: $0.00
Est. Annual CO2 Emissions: 0 kg CO2e
Daily Energy Flow by Time Slot (kWh)
Daily Energy Consumption by Group (%)
Detailed Energy Consumption (kWh) per Group & Slot
Rates & Operational Settings
$